Application 02 — Data centers

Stop the fire,
keep the records

Server rooms, telecom exchanges and control rooms are protected as a volume: agent calculated against the real room, detection cross-zoned so one dirty head cannot empty it, and a pre-discharge delay long enough for someone to look.

01 — The hazard

The fire is small.
The damage is not.

A data centre fire almost never starts as flame. It starts as a terminal screw, a capacitor or a cable bundle smouldering behind a rack — and by the time it is visible, the room is already full of the smoke that writes off the equipment.

Risk 01

Air movement

CRAC units and in-row cooling dilute smoke and carry it away from ceiling detectors. The airflow that keeps the servers alive is also what delays the alarm.

Risk 02

Continuous load

Rack density keeps climbing. Every extra kilowatt adds terminals, connectors and joints that loosen under thermal cycling — and every one of them is a place a fire can start.

Risk 03

Water writes it off

A sprinkler that saves the building still destroys what it lands on. The fire can be out and the room unusable for weeks afterwards.

Risk 04

Nobody in the aisle

Many rooms are unmanned at night and at weekends. Detection has to alarm, delay and discharge without waiting for someone to walk in and smell it.

02 — Design basis

Calculate the room,
not the catalogue

Agent quantity is a function of net room volume, the lowest expected room temperature and the design concentration — not of the number of racks. We calculate against the drawing, then check that the enclosure can actually hold that concentration long enough to work.

Total flooding · HFC-227ea
The whole roomOne enclosure, one calculation — the agent reaches every corner and holds.
Rack · 2U module · room stays clear
One cabinet beside itA standalone 42U rack with its own 2U module — protected on its own.
  • Net volume with equipment, columns and ductwork deducted
  • Design concentration selected for the risk and the agent
  • Nozzle coverage, throw and discharge time to the far corner
  • Pressure relief vent sized for the peak discharge rate
  • Hold time proven by a door-fan test where the room is not purpose-built

The rack beside the room is not a second room system. It is a self-contained 2U unit inside one cabinet — no cylinder room, no pipework through the building, and no discharge the rest of the data centre ever notices.

Single rack · local application

One cabinet can be
protected on its own

The animation above shows the standalone rack beside the room: fourteen 1U rack-mounted servers on a 19-inch frame, three roof nozzles, and a 2U FK-5-1-1 module at the bottom. Here is what that module actually is.

Not every server room justifies a total-flooding system. Where the risk is concentrated — an edge site, a telecom cabinet, one rack of network gear in an office — a 2U FK-5-1-1 module goes into the bottom of the cabinet and protects that cabinet only.

  • 2U or 4U module, slides into the rack like a server, screwed to the 19" posts
  • No cylinder room, no pipework, no nozzle grid — nothing to route through the building
  • 68 °C thermal bulb, or 24 V DC release from the panel with a dry contact back
  • Discharges into the free volume of the cabinet, so the room stays occupied
  • Sized per cabinet — typically 0.9 to 2.4 kg for a 42U enclosure
What a rack-embedded unit is
  • Form factor. A sealed agent cylinder inside a 2U or 4U steel case, with the valve, gauge and nozzles on the front face. It occupies rack units, not floor space.
  • Release. A thermal bulb breaks at 68 °C, or the fire panel energises a 24 V solenoid. Either way the agent leaves through nozzles built into the case and the cabinet fills in seconds.
  • When to choose it. One or two cabinets in a room that stays staffed, or a room where a total-flooding discharge would cost more in downtime than the hardware it saves.
03 — Control logic

Two detectors,
one decision

The most expensive failure in a server room is not the fire. It is the discharge nobody needed — followed by a week of cleaning and a room full of replaced hardware.

Stage 01

Alarm

The first detector in the zone goes into alarm. The panel drives a local sounder and, where the site has one, signals the building management system. No agent, no shutdown.

Stage 02

Confirmation

A second, different detector in the same zone has to confirm. Cross-zoning is what stops a dusty smoke head or a maintenance shortcut from emptying the room.

Stage 03

Pre-discharge

Sounders and beacons run, HVAC and fire dampers close, doors release. The delay is set long enough for staff to reach the abort switch or leave the room — and short enough that the fire does not grow past the design.

Stage 04

Discharge

The solenoid opens, the agent reaches design concentration within the discharge time, and the room stays sealed until it is safe to ventilate. Re-entry is a measurement, not a guess.

What an aspirating smoke detector is
  • How it works. A fan inside the detector head pulls room air through a network of sampling pipes. Every hole drilled along the pipe keeps a small air sample moving back to a laser chamber, which measures how much light the sample scatters.
  • Why it is used here. A point detector waits for smoke to reach it and needs visible density to trip. An aspirating system reads the same air at obscuration levels far below that, so it alarms while a cable is still smouldering — before the plastic in a server ignites.
  • Where the pipe goes. The sampling pipe runs above the rack row with one hole over each cabinet, because hot smoke collects at the top of the cabinet first. The head itself sits on the wall at the end of the run, where it can be serviced without entering the aisle.
04 — Configurations

Three ways to cover
the same room

The right one depends on room size, whether a cylinder store exists, and whether the risk is the whole room or one cabinet inside it.

Cabinet type HFC-227ea fire extinguishing device
Configuration 01 · Piped

Total flooding

A cylinder bank outside the room, a manifold and a nozzle grid on the ceiling. The standard answer for a purpose-built server hall or a telecom exchange.

AgentHFC-227ea or FK-5-1-1 Discharge≤10 s to design concentration Best for50–2,000 m³ rooms
Pre-engineered perfluorohexanone unit for inside a cabinet, slim silver extruded body with nameplate and a flying lead with connector at one end
Configuration 02 · Pre-engineered

Agent inside the cabinet

A pre-engineered unit fixes inside the rack or cabinet it protects: agent, gas generator and nozzle in one slim body that stores nothing under pressure. No cylinder room, no pipework — one unit per enclosure, up to 3 m³.

Agent2,500 g FK-5-1-12, zero pressure Release170 ± 10 °C cord or 24 V DC Covers≤ 3 m³ · ≤ 8 s discharge
Three cylindrical condensed aerosol fire extinguishing units, QRR 0.1, 0.2 and 0.3 G-S-ZHTA, in brushed stainless housings with thermal cord and mounting brackets
Configuration 03 · Aerosol

One cabinet at a time

Where the risk sits in a single wall cabinet or rack — a telecom cabinet in a corridor, a switchgear box on a factory floor — a sealed cylinder bolts inside the enclosure. The agent sits at zero pressure, so there is no pipework, no cylinder room and nothing to leak; the thermal cord runs to the hottest point and fires at 175 °C, with a 24 V release as the alternative.

ModelsQRR 0.1 / 0.2 / 0.3 G-S-ZHTA Covers≤ 1 / 2 / 3 m³ · ≤ 6 / 8 / 10 s Start175 ± 15 °C cord or 24 V DC, ≥ 0.7 A StandardXF 499.1-2010
05 — Coverage

Where the agent
has to reach

A server room is rarely one compartment. The floor void, the ceiling void and the room itself each hold cable and each has to be counted as its own volume.

Raised floor void

Cable trays and the cooling plenum. Nozzles are placed under the floor tiles with detection in the same void, because a fire in the plenum is invisible from the aisle.

Own volume
Ceiling void

Above a suspended ceiling is a second compartment, often full of data cable and often forgotten. It is flooded as its own volume, not left to the room design.

Separate calculation
Cable entries

Ducts and penetrations that leave the room are sealed, so the concentration holds under discharge and the fire cannot travel to the next compartment.

Enclosure integrity
06 — Specification

What the design is
measured against

The same sheet leaves us whether the project is a 60 m³ telecom room or a 1,800 m³ data hall.

DesignGB 50370-2005 · NFPA 2001 · EN 15004-1 · ISO 14520
Detection & alarmGB 50116-2013 · cross-zoned, two-stage alarm with abort switch
AgentHFC-227ea (FM-200) · FK-5-1-1 (Novec 1230)
Discharge≤10 s to design concentration · hold time ≥10 min
EnclosurePressure relief vent sized to the peak discharge rate; door-fan test where required
DocumentationCalculation sheet, P&ID, nozzle layout, O&M manual, as-built drawings
Lead time20–30 days for equipment, including filling and testing
Supply termsODM / OEM

Nozzle layout, cylinder size and vent area are project deliverables, not catalogue values. Send the plan and section and we return a calculation you can put in front of a reviewer.

07 — To quote

Four things
and we can size it

Everything else we can ask for once the first pass is done — but without these four the numbers would be a guess.

01

Plan & section

Room drawing with dimensions, plus the floor and ceiling void depths if the room has them.

02

Rack schedule

Number of racks, approximate kW each, and whether the load is expected to grow.

03

Existing detection

What is installed today, which panel, and whether a BMS or DCIM has to be interfaced.

04

Site conditions

Lowest and highest room temperature, access route for cylinders, and who commissions.

Send us the room
and the rack layout

You get the agent quantity, the nozzle plan and the equipment list — before any commercial discussion.

Start a project
YouTube Facebook WhatsApp