Battery energy storage containers on a completed site
Solutions

Protection that starts
at the hazard

Four application areas where clean agent suppression is not a commodity purchase. Each one has its own detection logic, its own agent and its own documentation — so each one has its own page.

01 — Four applications

One page each,
because the hazards differ

A battery container, a server room, a switchgear cabinet and a nacelle fail in four different ways. Keeping them separate keeps the engineering honest — open the one that matches your site.

Not sure which one applies? Most sites are one primary hazard with a second one attached — a battery container inside a data hall, a nacelle with a converter cabinet in the tower base. Send the layout and we will tell you which page the design belongs on.

02 — Process

From enquiry to
commissioning

The same five steps on every application, so you always know what happens next and what we need from you at each stage.

01

Survey

Room dimensions, hazard, enclosure integrity, existing detection and power availability.

02

Design

Agent selection, quantity calculation, nozzle layout and P&ID drawings for approval.

03

Manufacture

Cylinder filling, pressure and leak testing, control panel assembly and factory acceptance.

04

Install

Pipework, cylinders, detection and control installed and tested by our engineers or partners.

05

Commission

Functional test, discharge simulation, operator training and handover documentation.

Tell us what you are protecting

We will tell you which medium, which detection and roughly how much agent — before any commercial discussion.

Start a project
YouTube Facebook WhatsApp