Assembly line at the ZHTA factory in Hefei
Download centre

Solution documents

English editions of the technical solution documents our engineers issue with a quotation — system architecture, detection thresholds, release logic, bill of materials and calculations in one file.

Six documents

Pick the system
you are specifying

Each document is the English edition of the solution we would issue for that application: design basis, protected zones, detector thresholds, interlock matrix, full BOM and the agent calculation. Word format, so your consultant can mark it up.

Docx28 KB

20 ft 104S energy storage container — fire system solution

Pack-level composite detection with cluster-level release, cabin-level Novec 1230, explosion-proof ventilation, water spray interface, 17 BOM tables and the agent / venting calculations for a 33 m³ cabin.

Energy storageEnglishRev A/0
Download
Docx21 KB

IG-541 inert gas total-flooding system for a data centre

Design concentration 37.5 %, 15 MPa storage, 48–60 s discharge, aspirating smoke detection, selector-valve network, cylinder and relief-vent sizing worked through for a 1,102 m³ electrical room.

Data centreEnglishRev A/0
Download
Docx20 KB

Data centre computer room — gas extinguishing solution

Room-by-room protection with heat and aspirating smoke detection, coincidence release logic, pressure relief, interlock with power and air-conditioning, and the BOM for a single protected room.

Data centreEnglishRev A/0
Download
Docx23 KB

Containerised and mobile data centre — full configuration

The complete configuration schedule for a mobile IT hall: detection, gas extinguishing, ventilation, relief and control, with quantities per container and the commissioning sequence.

Data centreEnglishRev A/0
Download
Docx10 KB

Fire protection for power systems — seven technologies

Detection tube, pre-engineered Novec 1230, rack-embedded, aerosol, HFC-227ea, suspended dry powder and high-pressure water mist, with the space each one suits and how it releases.

Power systemsEnglishRev A/0
Download
Docx10 KB

Wind turbine generators — nacelle and tower protection

Passive and active schemes for the nacelle and each tower cabinet: dry powder in the nacelle, aerosol in the cabinets, heat / smoke / flame coincidence release and remote monitoring.

Wind powerEnglishRev A/0
Download
How these documents are issued. Each one is written for a reference project and the numbers in it follow that project — volume, concentration, cylinder count. Before you build from one, send us the room or cabin volume and the standard you are designing to, and we re-issue the calculation for your case. The Chinese editions sit on the Chinese site; datasheets, GA drawings and CAD blocks are still issued on request through the support desk.
Need something specific

A document for your project, not for ours

Send the protected volume, the hazard and the standard — NFPA 2001, EN 15004 or GB 50370 — and the design team returns a calculation sheet, nozzle layout and BOM in English, usually inside three working days.

Request a document
YouTube Facebook WhatsApp