A nacelle fire starts at the brake disc, a gearbox bearing or a cable joint, and it is usually discovered from the ground. The protection has to work without power, without a panel and without anyone climbing the tower.
A machine head is a small steel room full of oil, cable and rotating machinery, at the end of a climb. Everything about the protection has to assume that nobody will arrive in time.
80 to 120 metres, usually at night. The first response is a climb that takes longer than the fire does to become a write-off.
Auxiliary supplies and control cabinets are themselves a fire risk, and every one of them is another component that can fail before the agent does.
Gearbox oil and hydraulic lines under pressure sit next to hot surfaces. A leak onto a brake disc is the classic start, and the fire is fuelled from above.
A cylinder bank at the tower base needs a riser pipe, extra weight and penetrations through the tower — bottom-side maintenance for a top-side fire.
Non-pressurised dry powder units are suspended from the nacelle ceiling directly above the gearbox, the brake disc and the generator. Each unit carries its own heat-sensitive cord; when the cord is severed by heat, the unit generates its own propellant gas and the powder is out about a second later.
Every arrangement on this page uses the same body: a powder canister, a three-arm yoke that bolts to the nacelle ceiling frame, and the nozzle pointing straight down at the hazard.

ABC ultra-fine powder sits in the canister at atmospheric pressure until a heat cord or a 24 V signal fires the gas generator inside it. The powder leaves through the nozzle at the base, directly above the bearing or brake disc that is overheating — no riser pipe down the tower, no cylinder room at the bottom, and nothing charged between inspections.
A single unit over the middle of the machine head wastes most of its powder. Each origin gets its own unit, mounted directly above it.
Above the inspection cover, with the cord routed across the top of the housing where a bearing failure shows first.
Downwind of the disc, cord across the face. Seizure and pad wear both end here, and both leave the disc hot enough to ignite oil.
Over the slip ring and the drive-end bearing — the second most common origin after the brake, and the hardest to reach with a hand extinguisher.
Where the drive train sits in the nacelle: cabinet-level detection tube, or a small unit over the cable tray and the converter enclosure.
Sizing is by the free volume of the protected zone, not by nacelle size. Charges in this table are a starting point for a first-pass layout; the final charge comes from the nacelle drawing and the volume above each hazard.
The same body and the same heat cord across the range, so a nacelle with four different zones only needs one spare part number.
| Models | FFX-ACT2 / 3 / 4 / 5 / 6 / 7 / 8 / 10-ZHTA |
|---|---|
| Agent | ABC ultra-fine dry powder, ammonium phosphate based |
| Actuation | Heat cord WED 160–190 °C, automatic · electric igniter CYC-01 where a supervised release is required |
| Cord burn rate | 5.1 s per metre |
| Discharge | 1.0 s on all eight models |
| Residual powder | ≤5 % |
| Reaction force | 2.6–4.3 kN over 18–29 ms |
| Working temperature | −40 °C … +50 °C |
| Mounting | Suspended from the nacelle ceiling or a bracket, nozzle down — no pipework, no cylinder room |
| Standard & test | GA 602-2013 · CNCA-C18-03:2014 · type test Gn201711762 |
| Lead time | 20–30 days including production and powder filling |
| Supply terms | ODM / OEM |
Everything about the device is designed around the cost of getting a person to the machine head — so there is as little as possible up there to fail.
Each unit hangs from the existing ceiling frame or a short bracket. No pipe, no cable and no penetration of the nacelle shell, so the install does not touch the turbine's own certification.
No shell penetrationThe cord runs unbroken past the hazard, clipped clear of sharp edges, rotating parts and service hatches. The burn rate is what decides how quickly the unit fires after the heat arrives.
Route on the drawingVisual check plus a weight check at the annual turbine service. Nothing to reprogram, no battery to replace, no valve to exercise.
AnnualNacelle layouts differ between platforms far more than they look from outside. These four settle the number of units and where they hang.
Platform, rated power and whether the converter sits in the nacelle, the tower base or a separate container.
Section with the ceiling frame, bedplate and the free volume above each hazard.
Which origins the operator wants covered, and whether the hub or the tower top is included.
Whether a dry contact has to reach the turbine stop circuit or SCADA, and which protocol.
You get a unit layout, the cord routes and the charge per zone — drawn on your own drawing.
Open WeChat, tap + and pick Scan — the code opens a chat with our export desk. Not on WeChat? Message us on WhatsApp instead.
On a phone you cannot scan your own screen — long-press the code above, save it to your album, then open WeChat → + → Scan → Album.