Application 04 — Wind turbine

Eighty metres up,
nobody inside

A nacelle fire starts at the brake disc, a gearbox bearing or a cable joint, and it is usually discovered from the ground. The protection has to work without power, without a panel and without anyone climbing the tower.

01 — The hazard

The fire is at the top.
The response starts at the bottom.

A machine head is a small steel room full of oil, cable and rotating machinery, at the end of a climb. Everything about the protection has to assume that nobody will arrive in time.

Risk 01

Height

80 to 120 metres, usually at night. The first response is a climb that takes longer than the fire does to become a write-off.

Risk 02

No power

Auxiliary supplies and control cabinets are themselves a fire risk, and every one of them is another component that can fail before the agent does.

Risk 03

Oil & pressure

Gearbox oil and hydraulic lines under pressure sit next to hot surfaces. A leak onto a brake disc is the classic start, and the fire is fuelled from above.

Risk 04

Nothing at the base

A cylinder bank at the tower base needs a riser pipe, extra weight and penetrations through the tower — bottom-side maintenance for a top-side fire.

02 — The method

Hang it over
the hazard

Non-pressurised dry powder units are suspended from the nacelle ceiling directly above the gearbox, the brake disc and the generator. Each unit carries its own heat-sensitive cord; when the cord is severed by heat, the unit generates its own propellant gas and the powder is out about a second later.

  • 2–10 kg ABC ultra-fine, discharged in about 1.0 s
  • Heat cord fires at 160–190 °C — no power, no panel, no wiring loom
  • No riser pipe, and nothing stored under pressure in the tower
  • Cord burns at 5.1 s per metre, so the unit fires where the heat is
  • Optional dry contact to the turbine stop circuit or SCADA
  • Brackets for the nacelle ceiling frame or the bedplate
No power inside the nacelle
03 — The unit

One red canister,
bolted overhead

Every arrangement on this page uses the same body: a powder canister, a three-arm yoke that bolts to the nacelle ceiling frame, and the nozzle pointing straight down at the hazard.

Suspended dry powder extinguishing unit for wind turbines: red steel canister with a three-arm hanging yoke, yellow nameplate, and the powder nozzle with heat cord leads at the base
Suspended · FFX-ACF series

Powder, not pressure

ABC ultra-fine powder sits in the canister at atmospheric pressure until a heat cord or a 24 V signal fires the gas generator inside it. The powder leaves through the nozzle at the base, directly above the bearing or brake disc that is overheating — no riser pipe down the tower, no cylinder room at the bottom, and nothing charged between inspections.

ModelsFFX-ACF 3 / 4 / 5 / 8-ZHTA Charges3 / 4 / 5 / 8 kg ABC ultra-fine Covers20 / 26 / 33 / 53 m³ full volume StartHeat cord or 24 V DC, ≥ 1 A StandardGA 602-2013
04 — Coverage

One unit per hazard,
not per nacelle

A single unit over the middle of the machine head wastes most of its powder. Each origin gets its own unit, mounted directly above it.

Zone 01

Gearbox

Above the inspection cover, with the cord routed across the top of the housing where a bearing failure shows first.

  • Unit: 4–10 kg
  • Cord across the housing
Zone 02

Brake disc

Downwind of the disc, cord across the face. Seizure and pad wear both end here, and both leave the disc hot enough to ignite oil.

  • Unit: 2–4 kg
  • Cord across the disc face
Zone 03

Generator

Over the slip ring and the drive-end bearing — the second most common origin after the brake, and the hardest to reach with a hand extinguisher.

  • Unit: 4–6 kg
  • Clear of the cooling hood
Zone 04

Converter & cables

Where the drive train sits in the nacelle: cabinet-level detection tube, or a small unit over the cable tray and the converter enclosure.

  • Unit: 2–4 kg
  • Or detection tube

Sizing is by the free volume of the protected zone, not by nacelle size. Charges in this table are a starting point for a first-pass layout; the final charge comes from the nacelle drawing and the volume above each hazard.

05 — Selection

Eight charges,
one bracket

The same body and the same heat cord across the range, so a nacelle with four different zones only needs one spare part number.

ModelsFFX-ACT2 / 3 / 4 / 5 / 6 / 7 / 8 / 10-ZHTA
AgentABC ultra-fine dry powder, ammonium phosphate based
ActuationHeat cord WED 160–190 °C, automatic · electric igniter CYC-01 where a supervised release is required
Cord burn rate5.1 s per metre
Discharge1.0 s on all eight models
Residual powder≤5 %
Reaction force2.6–4.3 kN over 18–29 ms
Working temperature−40 °C … +50 °C
MountingSuspended from the nacelle ceiling or a bracket, nozzle down — no pipework, no cylinder room
Standard & testGA 602-2013 · CNCA-C18-03:2014 · type test Gn201711762
Lead time20–30 days including production and powder filling
Supply termsODM / OEM
06 — Installation & service

One climb in,
nothing to maintain

Everything about the device is designed around the cost of getting a person to the machine head — so there is as little as possible up there to fail.

Install in one shift

Each unit hangs from the existing ceiling frame or a short bracket. No pipe, no cable and no penetration of the nacelle shell, so the install does not touch the turbine's own certification.

No shell penetration
Cord routing

The cord runs unbroken past the hazard, clipped clear of sharp edges, rotating parts and service hatches. The burn rate is what decides how quickly the unit fires after the heat arrives.

Route on the drawing
Service

Visual check plus a weight check at the annual turbine service. Nothing to reprogram, no battery to replace, no valve to exercise.

Annual
07 — To quote

Four things
and we can lay it out

Nacelle layouts differ between platforms far more than they look from outside. These four settle the number of units and where they hang.

01

Turbine model

Platform, rated power and whether the converter sits in the nacelle, the tower base or a separate container.

02

Nacelle drawing

Section with the ceiling frame, bedplate and the free volume above each hazard.

03

Hazard list

Which origins the operator wants covered, and whether the hub or the tower top is included.

04

Interfaces

Whether a dry contact has to reach the turbine stop circuit or SCADA, and which protocol.

Send us the nacelle
section

You get a unit layout, the cord routes and the charge per zone — drawn on your own drawing.

Start a project
YouTube Facebook WhatsApp